HST Rebate on a New Custom Home in Ontario (2026 Guide)

Home /  Blog /  HST Rebate on a New Custom Home in Ontario (2026 Guide)

Last updated: November 19, 2026. Rebate rules are temporary and detailed — confirm your situation with an accountant before you sign or break ground.

If you own a lot in Toronto or the GTA and have been weighing a custom home or a knock-down rebuild, 2026 changed the math. Ontario’s temporary enhanced HST new housing rebate can take up to $80,000 of provincial HST off a new home, and a separate provincial payment can cover the federal 5% portion on top of that. But the rules for people who build on their own land are different from the rules for people buying from a subdivision builder — and the deadline that matters for you is not the one most headlines mention.

Here is what the HST rebate on a new home in Ontario means if you’re building a custom home, based on the Canada Revenue Agency’s own guidance.

The short version

  • Construction must begin between April 1, 2026 and March 31, 2027. For owner-built homes, it’s the construction start date that counts — not a purchase agreement.
  • The home must be substantially completed before 2030.
  • Its fair market value at substantial completion must be under $1,850,000. Above that, only the long-standing Ontario rebate (up to $24,000) applies.
  • It must be your (or a relative’s) primary residence.
  • You apply to the CRA yourself using Form GST191 and the Ontario schedule RC7191-ON.

What changed in 2026

Ontario has long had a new housing rebate on the 8% provincial part of the HST, capped at $24,000. In 2026 the province added a temporary Ontario Enhanced New Housing Rebate (ENHR). According to CRA Notice 346, together the two rebates can relieve up to $80,000 of the provincial HST on an eligible new home:

Value of the new home Provincial (8%) HST relief
Up to $1,000,000 100% of the 8% paid, up to $80,000
$1,000,000 – $1,500,000 Flat $80,000
$1,500,000 – $1,850,000 Partial, reducing as value rises
$1,850,000 and above No enhanced rebate — existing Ontario rebate of up to $24,000 only

The province also created the Ontario New Home Affordability Payment (ONHAP), which can cover up to $50,000 — up to 100% of the 5% federal part of the HST. The CRA notice says only people who are eligible for the ENHR can receive it, and that it is reduced by any federal new housing or first-time buyer rebate you already receive. There is no separate application: you consent to share your information on the rebate form.

Put together, that is how the “up to $130,000” figure in the news is reached. Whether your project gets close to that number depends on the details below.

Does the HST rebate apply if you build on your own lot?

Yes — the CRA treats this as an owner-built home, and the ENHR explicitly covers it. That includes hiring a builder to construct the house for you, and it also covers a qualifying substantial renovation. For owner-built homes, CRA Notice 346 sets out these conditions:

  1. Construction (or the substantial renovation) begins on or after April 1, 2026 and on or before March 31, 2027.
  2. It is substantially completed before 2030.
  3. The fair market value at substantial completion is less than $1,850,000.
  4. The home is built for use as your or your relation’s primary place of residence.

Notice what is missing: there is no purchase-agreement date for owner-built homes. The window that applies to you is the start of construction.

The deadline that actually matters: March 31, 2027

Most coverage of this rebate talks about agreements of purchase and sale signed by March 31, 2027. That deadline is for buyers purchasing from a builder. If you are building on your own land, your project needs to start construction by that date.

That is a much harder target than signing a contract. Before a shovel goes in the ground on a Toronto custom home, you typically need finished drawings, a building permit, utility disconnections and, on many lots, tree protection and demolition permits. Each step can take weeks or months. If you are starting design this winter, the window is already tight.

Two practical cautions:

  • “Begins” is a technical term. What the CRA considers the start of construction is a tax question. Get your accountant’s view in writing before you plan around a specific date.
  • Don’t rush into a bad schedule. A project started in a hurry to catch a rebate can cost more in delays and change orders than the rebate is worth. Plan the timeline honestly first. Our guide to pre-construction site readiness in Toronto walks through what has to happen before work can begin.

The $1.85 million test — where many GTA custom homes fall out

The rebate is based on value, and for owner-built homes the CRA looks at fair market value when the home is substantially completed. In many Toronto and York Region neighbourhoods, a new custom home will be worth more than $1,850,000 once finished. If yours is, the enhanced rebate and ONHAP don’t apply — only the regular Ontario rebate of up to $24,000.

How fair market value is assessed for your specific property is a question for your accountant or a qualified appraiser. Ask early, because the answer can change your budget and your design brief.

How to claim it (owner-built homes)

When you buy from a subdivision builder, the builder usually credits the rebate on closing. When you build your own home, you pay the HST along the way and apply to the CRA yourself. According to CRA Notice 346, owner-built homes and substantial renovations use:

  • Form GST191 — GST/HST New Housing Rebate Application for Owner-Built Houses
  • Form RC7191-ON — the GST191 Ontario Rebate Schedule

Because the claim is built from your own records, keep every invoice that shows HST paid — from your builder, trades and suppliers — organized from day one.

Development charges are also coming down

HST isn’t the only cost moving. Under the Canada–Ontario Development Charge Reduction Program, municipalities are cutting the one-time development charges levied on new homes. In Toronto, the federal government said the reduction could lower development charges by approximately $83,000 on a new single or semi-detached home.

Whether development charges apply to your project — and how much — depends on your municipality and on what is currently on your lot. Check your city’s current schedule before you finalize your budget.

Is 2026–27 the right time to build?

It can be, if three things line up:

  1. Your home will be under $1.85 million in value when complete, so the enhanced rebate is actually available.
  2. You can realistically start construction by March 31, 2027 — design, permits and site preparation included.
  3. The house you want is the right house anyway. A rebate should improve a good project, not justify a rushed one.

If you’re unsure about any of them, it is worth a conversation now rather than in February.

Frequently asked questions

Do I have to be a first-time buyer?

No. The enhanced Ontario rebate is not limited to first-time buyers. The home does have to be your (or a relative’s) primary residence.

Does a knock-down rebuild count as an owner-built home?

The CRA’s owner-built rules cover building a new house on land you own, including hiring a builder to do it. CRA Notice 346 does not specifically address demolishing an existing house first, so confirm how your project will be treated with your accountant before relying on the rebate.

What if my home is worth more than $1.85 million?

You would not qualify for the enhanced rebate or ONHAP, but the existing Ontario new housing rebate of up to $24,000 still applies if you otherwise qualify.

Which forms do I use?

For owner-built homes: Form GST191 with Form RC7191-ON, filed with the CRA.

Is this tax advice?

No. This article summarizes public CRA guidance as of November 2026. Rebate rules are temporary and can change; speak with a qualified accountant about your situation.

Planning a custom home in the GTA?

Torino Construction designs and builds custom homes, additions and knock-down rebuilds across Toronto and the GTA. If you’re trying to work out whether your project can realistically start before the rebate window closes, contact our team — we’ll walk you through a realistic schedule from design to groundbreaking.

Sources: Canada Revenue Agency, GST/HST Notice 346 — Ontario Enhanced New Housing Rebate (August 2026); Government of Canada news release, “Canada and Ontario Making Homes More Affordable in Toronto” (June 23, 2026).

Contact Us

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Do you have a design plan?